Product Manager · B2B SaaS · Spatial data · AI

MathewRayner

I take products from first idea to launch, and then make sure people use them. Five products, 39 epics and a 15-engineer team so far.

Open to remote PM roles London, UK
8.42 m 6.10 m
Fig. 1 · Scan to insightSample NIA 61.3 m²

5products

Owned end to end

39epics

Led since 2024

15eng

Engineering team

8yrs

In spatial data

Products, from idea to launch

Each product below shows how far I've taken it. The filled stages are done. Adoption is where most products quietly fail, so I treat release notes, training and usage checks as part of the job.

Spatial IQ

Mar 2026 – live Nov 2026

Client analytics on building digital twins: how efficiently a portfolio uses its space, building by building.

  • Wrote the specs, including portfolio metrics for space efficiency, circulation, structural flexibility and column density.
  • Scene Analysis went live for clients on 3 November, ahead of plan. Room analysis followed on 9 November.
  • Ran sales feedback sessions to shape what comes next: Spatial IQ Mobile, which updates a scan from a phone. First version due January.

Vertex Capture as a Service

Oct 2025 – V1 Oct 2026

A new version of the field capture app, plus support for more scanners across capture and processing.

  • Took it from first designs to production V1, coordinating the mobile app, the processing pipeline and operations.
  • Delivered Leica BLK360 support end to end, and opened the job system to scans from other hardware. The first NavVis job ran on 12 November.

Dimensions automation

Jan 2025 – ongoing

The drawing tool that turns scans into measured floorplans, automated one manual step at a time.

  • Planned a 15-epic automation roadmap and shipped auto-beautification, DXF icons, version history, quality checks and automatic door placement.
  • Launched an SVG editor in November, so standard plans no longer need finishing in Illustrator.
  • Ran a demo and training day for every release. When a feature sat unused for six months, I had the process rewritten and retrained the team.

Operations platform

Jun 2024 – Nov 2026

Orders, scheduling and reporting for the teams that deliver every job.

  • Restructured the order model, then added data management, auto-generated templates, unified projects and a Gantt-style planning calendar.
  • Added Mixpanel analytics and per-job, per-floor quality reporting.

Stak Hub 2.0

2026 – in build

The client portal, rebuilt to bring property data, documents and analytics into one place.

  • Wrote the gap analysis and work breakdown, and designed the permissions model. The build started on 11 November.
  • For Network Rail's 250-station programme, chose to build on NavVis IVION rather than from scratch, which shortened delivery.

How I run product

Prototype first. Spend engineering time second.

  1. A
    Walk the whole journeyI map every step from the user's first click to the delivered result before writing a ticket. That's where missing scope hides.
  2. B
    Make it clickableI build working demos and process maps with Claude and Claude Code, so a decision takes one meeting instead of three.
  3. C
    Ship in the openRelease notes for every release, a release channel, app guides, and technology updates at company townhalls.
  4. D
    Make quality everyone's jobI wrote the QA guide and test playbook the team uses, with a standard bug format and Jira workflow.

Before product

Years in the field and abroad taught me what the people using our products actually deal with.

  1. 2021 – 2023

    International Expansion Lead

    Pupil · UAE, New York, Singapore

    • Launched the product in three markets, hiring and training five staff in each.
  2. 2018 – 2021

    Digital Surveyor

    Spec · London

    • Laser-scan surveys for estate agents. RICS Property Measurer Certification, 2018.

Contact

Hiring a product manager?